Hong Kong Wellcome DC — Banana Ripening Rooms


Client

Wellcome Supermarket Distribution Centre

Location

Kowloon, Hong Kong

Commissioned

August 2025

Rooms

3 double-tier + 4 single-tier rooms (7 rooms in total)

Capacity

200 pallets

Commodity

Banana

Air coolers

Domestic air coolers

Ethylene

Catalytic Generators  Auto-Ripe®

Project brief

Three double-tier and four single-tier ripening rooms were installed in the Wellcome supermarket DC in Kowloon and commissioned in August 2025. Total capacity is 200 pallets, dedicated to bananas. Domestic air coolers were specified to suit local conditions. Ethylene is applied with Catalytic Generators Auto-Ripe® generators. Lind adapted room geometry and controls to Hong Kong floor-to-ceiling height, fire-code and power constraints.

Serves a major Hong Kong supermarket supply chain; commissioned August 2025.